MOCK UP TEST FOR LARGE CONCRETE POURS - TEMPERATURE MONITORING

                            
Mass concrete is defined as "any volume of concrete with dimensions large enough to require that measures be taken to cope with the generation of heat from hydration of cement and attendant volume change to minimize cracking."[ (ACI Committee 207–Mass and Thermally Controlled Concrete)
Mass concreting can result in high temperatures in concrete core during hydration process. Which can result thermal cracking of concrete in a severe way. Basically the temperature variance (in different locations of the concreted element) or the temperature gradient will cause the thermal cracking.





Maximum Limits

Maximum temperature - 78 'C
Maximum temperature variance - 27 'C


Hence it is  a good practice to do a temperature monitoring mockup in order for the better understanding of the maximum temperature rise, maximum core temperature of the concrete.

A sample mockup test is shown below with Grade 40 concrete mass concreting work.



 Details of the Test Block


A wooden box was used with polystyrene based insulation to simulate the maximum temperature rise as well as the maximum temperature differential.

The selected size of the Test Block is  1.5 m × 1.5 m × 1.5 m.

All the vertical and Horizontal surfaces was insulated with a layer of 25mm thick rig foam sheets in order to prevent heat loss as the interior part of the raft foundation in actual conditions. Top surface was covered with 25 mm thick sand layer.

The arrangement of thermocouples to monitor the core and surface temperatures is also shown in figure No: 01. Additional thermocouple was used to monitor the ambient temperature. Two data loggers were used to record the temperature at the selected locations at 10 & 15 minutes time intervals. Temperature monitoring was carried out for a period of 7 days to obtain the following information.


1.  Maximum temperature rise
2.  Maximum temperature differential



Mix Design Details


Grade

: - 40 N/mm2 (Temperature Controlled)


Slump

: - 180 +/-25 mm





Data Logger Arrangement Details

Mockup test block arrangement




Sensors arrangement 

Concrete pouring

 Data Loggers connection & start reading



Test Results

Date of testing
- 01-01-2020

Placing of concrete
:

Batching Started at
: 11.45 AM
Batching Finished at
: 11.56 AM

Pouring Started at
: 12.45 PM
Pouring Finished at
: 13.35 PM
Ambient temperature
: 31.0 OC
Pouring temperature
: 26.5 OC
Temperature monitoring at
: 14.38 











https://freeminds-on.blogspot.com/

Comments

  1. This comment has been removed by the author.

    ReplyDelete

Post a Comment

Popular posts from this blog

BORED AND CAST IN SITU PILES

Bored and cast in-situ piles or bored & cast in place piles carries the process of installation in the name it self. A bored and cast in-situ pile is installed by boring the soil and or rock using heavy machinery and pouring concrete to the bored hole with or without steel reinforcement. Figure: Rotary drilling machines in the process of pile boring You can watch the detailed process in video form the following link  https://www.youtube.com/watch?v=u6YGxSzvmKo You can check more details from the following link MOS for Bored Cast In situ Pile Installation https://engcivilstuff.blogspot.com/2020/03/bored-piling-installation-by-rotary.html

BOQ FOR A GRIENFIELD TELECOMMUNICATION TOWER CONSTRUCTION

Bill of Quantities for a Tower Construction A BOQ for a telecommunication tower use for Civil Engineering works is shown in figures below. Normally in a construction of a telecommunication tower, the Civil work contractor has to undertake site clearance, access road preparation, fencing, plinths for other equipment like BTU or generators, Meter compartments if any, Foundation of tower, etc. and the installation of tower by using Rigger teams.