SAMPLE DESIGN OF FOUNDATION FOR A SELF STANDING TELECOMMUNICATION TOWER

Design of the foundation will be based on the,
  • Geotechnical parameters obtained by soil report at the location
  • Parameters given by the steel tower designer
  • Details on antenna sizes, etc.
  • Other parameters such as wind, etc.
  • Type of tower




A sample design in shown below.



Comments

Popular posts from this blog

MOCK UP TEST FOR LARGE CONCRETE POURS - TEMPERATURE MONITORING

                             Mass concrete is defined as "any volume of concrete with dimensions large enough to require that measures be taken to cope with the generation of heat from hydration of cement and attendant volume change to minimize cracking." [ ( ACI Committee 207–Mass and Thermally Controlled Concrete ) Mass concreting can result in high temperatures in concrete core during hydration process. Which can result thermal cracking of concrete in a severe way. Basically the temperature variance (in different locations of the concreted element) or the temperature gradient will cause the thermal cracking.

BORED AND CAST IN SITU PILES

Bored and cast in-situ piles or bored & cast in place piles carries the process of installation in the name it self. A bored and cast in-situ pile is installed by boring the soil and or rock using heavy machinery and pouring concrete to the bored hole with or without steel reinforcement. Figure: Rotary drilling machines in the process of pile boring You can watch the detailed process in video form the following link  https://www.youtube.com/watch?v=u6YGxSzvmKo You can check more details from the following link MOS for Bored Cast In situ Pile Installation https://engcivilstuff.blogspot.com/2020/03/bored-piling-installation-by-rotary.html

SITE PREPARATION & INSTALLATION OF A STEEL TELECOMMUNICATION TOWER

In a greenfield telecommunication tower installation project, there are few major steps as below; Site clearing Setting out of tower location and other equipment locations Foundation work Installation of steel tower Fixing Antenna brackets Earthing of tower Plinths for other equipment Fencing & completion Final acceptance test Site clearing Setting out of tower location Setting out will be done using a Total station machine. Normally the direction of antennas are given in the site handing over document by the planning division. And the arrangement plan of the tower premises also given by the document. The direction of legs and the location of tower will be suitably selected by the engineer or surveyor considering above facts. Tower foundation construction There are few steps in tower foundation construction after setting out of tower or tower legs locations. The steps are as follows; Excavation of foundation (dewaterin...