Final Acceptance Test (FAT) for Telecommunication Towers



A quality check on the erected Tower (steel on concrete footings or other means) will be conducted by the civil construction engineering team, prior to install the telecommunication antennas and prior to handing over to the telecommunication engineering team.
Basically the tightness of steel members, verticality of tower, foundation condition, plinths for other equipment, earthing work, etc. will be checked and ensured all are in order based on a check list.

A Sample check list is shown below.



Mix -->

Comments

Popular posts from this blog

SHEET PILING

Sheet Piling is a common solution for temporary shoring work in deep excavations in the field of civil engineering. Sheet pile is a steel pile with the shape of letter C. Width, thickness, length and the shape of the sheet piles are in different categories. Normally the widths are in the range of 300mm to 700mm. And the length of the piles are normally 6m or 12m. Sample sizes of sheet piles are shown in above table.

MOCK UP TEST FOR LARGE CONCRETE POURS - TEMPERATURE MONITORING

                             Mass concrete is defined as "any volume of concrete with dimensions large enough to require that measures be taken to cope with the generation of heat from hydration of cement and attendant volume change to minimize cracking." [ ( ACI Committee 207–Mass and Thermally Controlled Concrete ) Mass concreting can result in high temperatures in concrete core during hydration process. Which can result thermal cracking of concrete in a severe way. Basically the temperature variance (in different locations of the concreted element) or the temperature gradient will cause the thermal cracking.

SITE PREPARATION & INSTALLATION OF A STEEL TELECOMMUNICATION TOWER

In a greenfield telecommunication tower installation project, there are few major steps as below; Site clearing Setting out of tower location and other equipment locations Foundation work Installation of steel tower Fixing Antenna brackets Earthing of tower Plinths for other equipment Fencing & completion Final acceptance test Site clearing Setting out of tower location Setting out will be done using a Total station machine. Normally the direction of antennas are given in the site handing over document by the planning division. And the arrangement plan of the tower premises also given by the document. The direction of legs and the location of tower will be suitably selected by the engineer or surveyor considering above facts. Tower foundation construction There are few steps in tower foundation construction after setting out of tower or tower legs locations. The steps are as follows; Excavation of foundation (dewaterin...